

3-Bedroom Apartment (Finished) — Fountain View Residences, 1st Floor
Type
For Sale
Price
₦136,000,000 (Finished) | ₦106,000,000 (Semi-Finished)
Beds
3
Baths
4
Size
200 m²
Built in
2025
Floors
First Floor
Parking
On-estate parking — included in infrastructure
Property ID
PB-0101-FV-3BED-FF
A finished 3-bedroom apartment in Fountain View Residences — 200 sqm, ground floor, fitted kitchen, fitted wardrobes. Move in, furnish, and you're done. The estate handles everything outside your front door: roads, drainage, power generation, and water supply are all covered by the developer. Fountain View is under active construction right now. The external rendering is complete, windows are going in, and the estate infrastructure is in place. Buying now means locking in today's price while the development reaches handover. Verified by Propabridge — title and physical inspection confirmed.
Amenities
FLOOR | FLOOR NAME | SEMI-FINISHED | FINISHED (incl. kitchen + wardrobes) |
GR. | Ground Floor | ₦108,000,000 | ₦140,000,000 |
FIR. | First Floor | ₦106,000,000 | ₦136,000,000 |
SEC. | Second Floor | ₦102,000,000 | ₦130,000,000 |
FOR. | Fourth Floor | ₦99,000,000 | ₦127,000,000 |
Property Specifications
3 BEDROOMS | 4 BATHROOMS | 200 m² SIZE | GF FLOOR | Finished DELIVERY | ₦140M PRICE |
Bedrooms | 3 |
Bathrooms | 4 |
Size | 200 sqm |
Floor | Ground Floor |
Kitchen | Fitted kitchen — included in finished price |
Wardrobes | Fitted wardrobes — included in finished price |
Estate Type | Fully serviced, gated residential estate |
Security | Secure estate — entrance/exit security doors per unit |
Power | Estate generating set — included in infrastructure |
Water | Estate water reticulation and sewer plant |
Parking | On-estate parking — included in infrastructure |
Construction | Active — advanced carcass stage, rendering complete |
Construction Status
Active construction. External rendering is complete across the apartment blocks. Windows are being installed. The 4-bedroom terrace units are at earlier carcass stage. Development photos (November 2025) confirm significant progress — estate infrastructure tracks are visible and levelled.
Expected completion timeline to be confirmed with Propabridge Team at enquiry stage.

lISTED BY






